With more than 12 years of experience

Full coordination

Complete renovation
incl. installation technology and finishing

In this project, we fully renovated a closed kitchen in a 1980s house. The original space was functional, but outdated in terms of finish and layout. The project began with a technical inventory of the existing connections, pipes, and support structures, after which we managed the entire demolition, preparation, and installation process in-house. During the dismantling phase, we protected the kitchen with a temporary screen, including dust-proof film, so that surrounding areas remained clean and accessible. The old tiled wall was removed, pipes were rerouted, and the subfloor was rebuilt for a smooth, seamless finish.

Request a quote

Call us

+31 6 253 211 98

In this project, we fully renovated a closed kitchen in a 1980s house. The original space was functional, but outdated in terms of finish and layout. The project began with a technical inventory of the existing connections, pipes, and support structures, after which we managed the entire demolition, preparation, and installation process in-house. During the dismantling phase, we protected the kitchen with a temporary screen, including dust-proof film, so that surrounding areas remained clean and accessible. The old tiled wall was removed, pipes were rerouted, and the subfloor was rebuilt for a smooth, seamless finish.